Refineries and Terminals
The Group’s highly-qualified core management think-tank and engineering personnel have proved beyond doubt that no dream is impossible to realise; no effort spared in fructifying results… reason enough to witness and marvel at NRP’s project execution capability today!
- LSTK PACKAGE-3 (JETTY Pipeline and associated facilities) for Ethylene Glycol Project at Paradip Refinery, Paradip, Odisha- for M/s. Indian Oil Corporation Ltd., Pipelines Division – 20” SS Pipe of 10 Km’s.
- Supply, Fabrication, Erection, Installation, Testing, Cold Insulation, Painting, Pre-commissioning, and Commissioning of 16’’ Dia. each Propane and Butane Cross Country Pipelines from Jetty to NGC Refrigerated LPG Import Terminal at Adani Krishnapatnam Port, Andhra Pradesh, India – M/s. Petregaz NGC Energy India Pvt. Ltd – 16” OD A-333- 6.35 Km’s
- Laying 30” OD, 117.00 Km (Approx.) Cross Country R-LNG Pipeline from Ennore RLNG Terminal to IP 101 (Palliyagram) & 6.625” OD, 26.00 KM (approx.) Spur lines and Combined Station works for associated sectionalizing valve station, Receiving terminals & Dispatch terminal
- Laying of Cross Country R-LNG pipeline from IP-101 (Palliyagram) to IP 105 (Ramanthapuram) & Tehran Jonoob Technical & Construction Co. Gujarat- 30” OD – 59.64Kms & 24”OD – 72.85Kms
- Fabrication & Erection Of Underground Pipeline From BPCL Ennore Coastal Installation To Ennore Tank Terminal Pvt. Ltd. At Ennore, Tamilnadu for M/s. Bharat Petroleum Corporation Limited, 24” OD Twin pipeline – 17.62KM
- Mainline works from Chennai Port to CPCL Refinery, Composite Station works at Scrapper Launching Area and Composite Station Works at Scrapper Receiving Area- for M/s. Indian Oil Corporation Ltd., Pipelines Division, 42” OD -12300 mtrs
- Laying 20”/14”/12” OD petroleum product pipeline in Railway corridor from IOCL – Korrukupet Terminal to Chennai Port Trust and combined station works of Mechanical, Civil & electrical works and Other facilities at Korrkupet terminal and Chennai Port Trust Group A M/s. Indian Oil Corporation Ltd., Pipelines Division,– 20”/14”/12” OD – 5500 m Each in a single trench
What is Included
NRP is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.
Steeler™ is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.
NRP is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.
NRP is an emerging programme built on five years of work to define and promote steel that has been produced and sourced responsibly. The Australian Steel Stewardship Forum initially developed the concept.